Planned improvements

The Water Industry National Environment Programme (WINEP) is the set of actions the Environment Agency legally requires South West Water to complete each price-review cycle. These are River Dart-catchment actions — what’s been promised, and by when. The previous cycle (AMP7, 2020–25) shows how many deadlines have already passed.

20

Current commitments (PR24)

3

Storm-overflow actions

36

Previous cycle, deadline passed

31/12/2026

Next deadline

36 actions required in the previous cycle (AMP7, 2020–25) had a legal deadline that has now passed. Per-action delivery is not openly published — these flags are against the published deadline only.

WINEP actions for the River Dart catchment

EA Water Industry National Environment Programme

Current cycle — required by 2030

  • PR24 / AMP8U_MON4due 31/12/2026

    BROADHEMPSTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR24 / AMP8U_MON3due 31/12/2026

    BROADHEMPSTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR24 / AMP8U_MON4due 31/12/2026

    DITTISHAM STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR24 / AMP8U_MON3due 31/12/2026

    DITTISHAM STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR24 / AMP8U_MON3due 31/12/2026

    HARBERTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR24 / AMP8U_MON4due 31/12/2026

    HARBERTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR24 / AMP8U_MON4due 31/12/2026

    HARBERTONFORD STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR24 / AMP8U_MON3due 31/12/2026

    HARBERTONFORD STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR24 / AMP8U_MON3due 31/12/2026

    PRINCETOWN SEWAGE TREATMENT WORKS

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR24 / AMP8U_MON4due 31/12/2026

    PRINCETOWN SEWAGE TREATMENT WORKS

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR24 / AMP8HD_INVdue 31/12/2026

    Swincome, Venford Res, Devonport leat flow EFI and CSMG

    Habitat Regulations (Previously known as Habitats Directive): Investigation and or options appraisal to determine impacts of water company activities, or permit / licence conditions/standards on a European site or Ramsar site or to determine the costs and technical feasibility of meeting targets.

  • PR24 / AMP8WFD_INV_MODdue 30/04/2027

    River swincombe Ecological investigation

    Water Framework Directive (Surface Waters): Investigations to ensure no river, lake or estuary is in poor or bad ecological status due to the water industry.

  • PR24 / AMP8U_IMP7due 31/03/2028

    LADY MEADOW STW (NK_WIDECOMBE)

    Urban Waste Water treatment Regulations: Provide secondary treatment capable of achieving 40:60 Biochemical Oxygen Demand (BOD):suspended solids where a septic tank discharges to surface water

  • PR24 / AMP8EE_IMPdue 31/03/2030

    Eel Abstraction - Blackbrook

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

  • PR24 / AMP8EE_IMPdue 31/03/2030

    Eel Obstruction - Black Brook

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

  • PR24 / AMP8EE_IMPdue 31/03/2030

    Eel Obstruction - Cowsic River

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

  • PR24 / AMP8EE_IMPdue 31/03/2030

    Eel Obstruction - West Dart

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

  • PR24 / AMP8WFD_IMP_MODdue 31/03/2030

    River Swincombe Ecological Implementation

    Water Framework Directive (Surface Waters): Actions to ensure no river, lake or estuary is in poor or bad ecological status due to the water industry.

  • PR24 / AMP8U_IMP1due 13/05/2030

    DARTMOUTH_STW_DARTMOUTH

    Urban Waste Water treatment Regulations: Actions to improve discharges from agglomerations that, through population growth, have crossed the population thresholds in the UWWTR and therefore must achieve more stringent UWWTR requirements. This includes newly qualifying discharges (from agglomerations >10,000pe) within existing sensitive areas. This includes discharges of >2,000 pe to fresh waters and estuaries and discharges >10,000 pe to coastal waters, as well as discharges >10,000 pe and 100,000 pe to Sensitive Areas .

    new permit limit DWF → 4644
  • PR24 / AMP8U_IMP1due 13/05/2030

    RATTERY_STW_RATTERY

    Urban Waste Water treatment Regulations: Actions to improve discharges from agglomerations that, through population growth, have crossed the population thresholds in the UWWTR and therefore must achieve more stringent UWWTR requirements. This includes newly qualifying discharges (from agglomerations >10,000pe) within existing sensitive areas. This includes discharges of >2,000 pe to fresh waters and estuaries and discharges >10,000 pe to coastal waters, as well as discharges >10,000 pe and 100,000 pe to Sensitive Areas .

    new permit limit BOD → 40

Previous cycle (AMP7, 2020–25) — delivery baseline

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    ASHPRINGTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    BROADHEMPSTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON4⚠ deadline passed: 31/03/2021

    BUCKFASTLEIGH STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    CORNWORTHY STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON4⚠ deadline passed: 31/03/2021

    Dartmouth STW: Mayors Avenue Pumping Station, Dartmouth

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    DITTISHAM STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    HARBERTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    HARBERTONFORD STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON4⚠ deadline passed: 31/03/2021

    PRINCETOWN SEWAGE TREATMENT WORKS

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR19 / AMP7SW_MON⚠ deadline passed: 31/03/2021

    Priory Slip PS

    Dart_E
  • PR19 / AMP7SW_MON⚠ deadline passed: 31/03/2021

    Smith Street CSO

    Dart_E
  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2021

    STAVERTON STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_MON4⚠ deadline passed: 31/03/2021

    TOTNES STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified FPF flow monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON4a- Move AMP7 U_MON4 driver output to 2-minute flow monitoring U_MON4b- Move AMP7 U_INV2 driver output to 2-minute flow monitoring U_MON4c- PR24 U_MON4 from U_INV2 investigation U_MON4d- MCERTS certified Flow passed forward flow monitor U_MON4e- MCERTS certified Flow passed forward flow monitor including civils

  • PR19 / AMP7SW_MON⚠ deadline passed: 31/03/2021

    Warfleet Creek PS

    Dart_E
  • PR19 / AMP7SW_MON⚠ deadline passed: 31/03/2021

    Yarrow Bank PS

    Dart_E
  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    ASHPRINGTON STW

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    BROADHEMPSTON STW

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2022

    BUCKFASTLEIGH STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    CORNWORTHY STW

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2022

    Dartmouth STW: Mayors Avenue Pumping Station, Dartmouth

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7INNS_INV⚠ deadline passed: 31/03/2022

    Devonport leat intake (to Burrator) - RWT INNS

    Invasive Species (INNS): Investigations -Includes pathway analysis, prevention of deterioration and actions to achieve conservation objectives.

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    DITTISHAM STW

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    HARBERTON STW

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    HARBERTONFORD STW

  • PR19 / AMP7NERC_INV1⚠ deadline passed: 31/03/2022

    Kilbury STW

  • PR19 / AMP7U_MON2⚠ deadline passed: 31/03/2022

    RATTERY STW_SO_RATTERY

  • PR19 / AMP7U_INV2⚠ deadline passed: 31/03/2022

    STAVERTON STW

  • PR19 / AMP7INNS_INV⚠ deadline passed: 31/03/2022

    Swincombe Intake - investigate risks from raw water transfer

    Invasive Species (INNS): Investigations -Includes pathway analysis, prevention of deterioration and actions to achieve conservation objectives.

  • PR19 / AMP7U_IMP6⚠ deadline passed: 31/03/2023

    BROADHEMPSTON STW

    Urban Waste Water treatment Regulations: Increasing storm tank capacity to provide adequate settlement and detention at WwTW`s that were identified in PR19 and were subsequently deferred until PR24 by the written agreement of the Environment Agency

  • PR19 / AMP7U_IMP6⚠ deadline passed: 31/03/2023

    CORNWORTHY STW

    Urban Waste Water treatment Regulations: Increasing storm tank capacity to provide adequate settlement and detention at WwTW`s that were identified in PR19 and were subsequently deferred until PR24 by the written agreement of the Environment Agency

  • PR19 / AMP7U_MON2⚠ deadline passed: 31/03/2023

    SCORRITON STW_SO_SCORRITON

  • PR19 / AMP7U_IMP5⚠ deadline passed: 31/03/2024

    PRINCETOWN SEWAGE TREATMENT WORKS

    Urban Waste Water treatment Regulations: Increasing Flow Passed Forward (FPF) flows at WwTW’s that were identified in PR19 as having low permitted FPF/Dry Weather Flow (DWF) ratios and were subsequently deferred until PR24 by the written agreement of the Environment Agency.

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2024

    PRINCETOWN SEWAGE TREATMENT WORKS

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7EE_IMP⚠ deadline passed: 31/03/2025

    Cowsic

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

  • PR19 / AMP7U_MON3⚠ deadline passed: 31/03/2025

    TOTNES STW

    Urban Waste Water treatment Regulations: MCERTS (Monitoring Certification Scheme for environmental permit holders) certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station (SPS) overflows U_MON3a- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor U_MON 3b- MCERTS certified overflow operation monitor

  • PR19 / AMP7EE_IMP⚠ deadline passed: 31/03/2025

    West Dart

    Eels: Schemes to improve diversion structures to prevent the entrainment of eel (for example screening intakes) and to address barriers to the passage of eel (for example building and maintaining eel passes).

WINEP locations are EA-published to ~1 km; actions are matched to this asset by works name and water body, so treat them as applying to the works/water body. Per-action delivery is not openly published — overdue flags are against the legal deadline only.

Source: Environment Agency Water Industry National Environment Programme (PR24 & PR19), decoded against the EA driver-code register. Actions are matched to catchment works and water bodies by name and WFD water-body id.