Dartington Sch Two

Spill evidence · Friends of the Dart

Dartington Sch Two

Combined sewer overflow · SBB00349 · feeds TOTNES STW
Dry spill

Evidence strength

Low confidence
  • Dry on the EA 1-day window
  • Monitor 100% operational that year
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Monday, 8 February 2021
Started
8 Feb 2021, 11:32
Ended
8 Feb 2021, 11:48
Duration
16 minutes 10 seconds
Receiving water
Bidwell Brook
Parish
Dartington

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/02/2021 (spill day)0 mmdry
07/02/20210 mmdry
06/02/20211.3 mmrain
05/02/20210.6 mmrain
04/02/20213.5 mmrain

River flow that day: 14.319 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2021)
64 counted spills · 637 h total
Monitor uptime (2021)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00349). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Dartington Sch Two — River Hub