DARTINGTON SCH TWO_CSO_DARTINGTON

Spill evidence · Friends of the Dart

DARTINGTON SCH TWO_CSO_DARTINGTON

Combined sewer overflow · SBB00349 · feeds TOTNES STW
Wet weather

The discharge

Spill day
Sunday, 8 February 2026
Started
8 Feb 2026, 19:37
Ended
8 Feb 2026, 21:39
Duration
2 hours 2 minutes
Receiving water
Bidwell Brook
Parish
Dartington

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/02/2026 (spill day)9.7 mmrain
07/02/20265.7 mmrain
06/02/202612.5 mmrain
05/02/202613.5 mmrain
04/02/202612.8 mmrain

River flow that day: 42.946 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00349). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.