Dartington Sch Two

Spill evidence · Friends of the Dart

Dartington Sch Two

Combined sewer overflow · SBB00349 · feeds TOTNES STW
Wet weather

The discharge

Spill day
Tuesday, 15 November 2022
Started
15 Nov 2022, 02:41
Ended
15 Nov 2022, 11:20
Duration
8 hours 39 minutes
Receiving water
Bidwell Brook
Parish
Dartington

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
15/11/2022 (spill day)18.2 mmrain
14/11/202232.6 mmrain
13/11/20223 mmrain
12/11/20220 mmdry
11/11/20220 mmdry

River flow that day: 48.487 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2022)
50 counted spills · 478 h total
Monitor uptime (2022)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00349). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Dartington Sch Two — River Hub