Bridgetown Steamer Quay, Totnes

Spill evidence · Friends of the Dart

Bridgetown Steamer Quay, Totnes

Combined sewer overflow · SBB01167 · feeds TOTNES STW
No rain data

The discharge

Spill day
Friday, 19 February 2021
Started
19 Feb 2021, 23:27
Ended
19 Feb 2021, 23:42
Duration
15 minutes
Receiving water
Harbourne River
Parish
Totnes

Rainfall evidence

Daily rainfall at the matched gauge (Harbertonford Slipperstone) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
19/02/2021 (spill day)no data
18/02/2021no data
17/02/2021no data
16/02/2021no data
15/02/2021no data

River flow that day: 80.153 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2021)
45 counted spills · 76 h total
Monitor uptime (2021)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01167). Rainfall: EA Hydrology gauge 8d954129-924c-47e3-8750-5f29a59617b2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.