BRIDGETOWN STEAMER QUAY_CSO_TOTNES

Spill evidence · Friends of the Dart

BRIDGETOWN STEAMER QUAY_CSO_TOTNES

Combined sewer overflow · SBB01167 · feeds TOTNES STW
Wet weather

The discharge

Spill day
Friday, 29 August 2025
Started
29 Aug 2025, 00:05
Ended
29 Aug 2025, 01:18
Duration
1 hour 12 minutes
Receiving water
Harbourne River
Parish
Totnes

Rainfall evidence

Daily rainfall at the matched gauge (Harbertonford Slipperstone) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/08/2025 (spill day)0.7 mmrain
28/08/202543.1 mmrain
27/08/20258.6 mmrain
26/08/20256.2 mmrain
25/08/20250.9 mmrain

River flow that day: 2.887 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Dart
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
39 counted spills · 91 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01167). Rainfall: EA Hydrology gauge 8d954129-924c-47e3-8750-5f29a59617b2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — BRIDGETOWN STEAMER QUAY_CSO_TOTNES — River Hub