Stonepark Crescent, Ashburton

Spill evidence · Friends of the Dart

Stonepark Crescent, Ashburton

Combined sewer overflow · SBB01186 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Sunday, 25 February 2024
Started
25 Feb 2024, 21:06
Ended
25 Feb 2024, 22:23
Duration
1 hour 17 minutes
Receiving water
Ashburn
Parish
Ashburton

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/02/2024 (spill day)26.6 mmrain
24/02/20241.9 mmrain
23/02/20245.4 mmrain
22/02/202410.3 mmrain
21/02/202421.1 mmrain

River flow that day: 68.506 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
63 counted spills · 177 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01186). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Stonepark Crescent, Ashburton — River Hub