Opp 26 Market Street, Buckfastleigh

Spill evidence · Friends of the Dart

Opp 26 Market Street, Buckfastleigh

Combined sewer overflow · SBB01408 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Thursday, 28 August 2025
Started
28 Aug 2025, 23:44
Ended
29 Aug 2025, 00:22
Duration
38 minutes
Receiving water
Mardle
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
28/08/2025 (spill day)28 mmrain
27/08/20252.2 mmrain
26/08/202510.6 mmrain
25/08/20250.6 mmrain
24/08/20250 mmdry

River flow that day: 2.342 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
32 counted spills · 51 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01408). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Opp 26 Market Street, Buckfastleigh — River Hub