OPP 26 MARKET STREET_CSO_BUCKFASTLEIGH

Spill evidence · Friends of the Dart

OPP 26 MARKET STREET_CSO_BUCKFASTLEIGH

Combined sewer overflow · SBB01408 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Tuesday, 9 December 2025
Started
9 Dec 2025, 00:30
Ended
9 Dec 2025, 14:44
Duration
14 hours 14 minutes
Receiving water
Mardle
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/12/2025 (spill day)8.2 mmrain
08/12/202552.3 mmrain
07/12/202512.3 mmrain
06/12/202514.6 mmrain
05/12/202537 mmrain

River flow that day: 122.185 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
32 counted spills · 51 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01408). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — OPP 26 MARKET STREET_CSO_BUCKFASTLEIGH — River Hub