Pear Tree Cross, Ashburton

Spill evidence · Friends of the Dart

Pear Tree Cross, Ashburton

Combined sewer overflow · SBB00917 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Monday, 25 November 2024
Started
25 Nov 2024, 08:42
Ended
25 Nov 2024, 09:08
Duration
26 minutes
Receiving water
Ashburn
Parish
Ashburton

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/11/2024 (spill day)1.3 mmrain
24/11/202435.8 mmrain
23/11/202462.1 mmrain
22/11/202418.8 mmrain
21/11/20245 mmrain

River flow that day: 38.75 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
64 counted spills · 189 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00917). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Pear Tree Cross, Ashburton — River Hub