Kilbury STW, Buckfastleigh

Spill evidence · Friends of the Dart

Kilbury STW, Buckfastleigh

Storm overflow at the works · SBB00178 · feeds BUCKFASTLEIGH STW
Dry spill

Evidence strength

High confidence
  • Sustained discharge (≥1 h)
  • Dry across a 3-day window
  • Rain gauge close (≤5 km)
  • Monitor 100% operational that year

The discharge

Spill day
Sunday, 2 March 2025
Started
2 Mar 2025, 08:33
Ended
2 Mar 2025, 12:09
Duration
3 hours 35 minutes
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Wet weather
DateRainfall
02/03/2025 (spill day)0.1 mmdry
01/03/20250.1 mmdry
28/02/20250.1 mmdry
27/02/20250 mmdry
26/02/20250.7 mmrain

River flow that day: 14.239 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Not Applicable
EA annual return (2025)
90 counted spills · 1406 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00178). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Kilbury STW, Buckfastleigh — River Hub