Kilbury STW, Buckfastleigh

Spill evidence · Friends of the Dart

Kilbury STW, Buckfastleigh

Storm overflow at the works · SBB00178 · feeds BUCKFASTLEIGH STW
Dry spill

Evidence strength

High confidence
  • Long discharge (≥6 h)
  • Dry on the EA 1-day window
  • Rain gauge close (≤5 km)
  • Monitor 100% operational that year

The discharge

Spill day
Friday, 22 October 2021
Started
22 Oct 2021, 05:35
Ended
22 Oct 2021, 22:49
Duration
17 hours 13 minutes
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/10/2021 (spill day)0 mmdry
21/10/20210 mmdry
20/10/202127.7 mmrain
19/10/202150.3 mmrain
18/10/202116.8 mmrain

River flow that day: 16.504 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Not Applicable
EA annual return (2021)
107 counted spills · 1340 h total
Monitor uptime (2021)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00178). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.