OLD WOOLLEN MILL_CSO_BUCKFASTLEIGH

Spill evidence · Friends of the Dart

OLD WOOLLEN MILL_CSO_BUCKFASTLEIGH

Combined sewer overflow · SBB00885 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Sunday, 24 November 2024
Started
24 Nov 2024, 03:38
Ended
24 Nov 2024, 04:04
Duration
26 minutes
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/11/2024 (spill day)35.8 mmrain
23/11/202462.1 mmrain
22/11/202418.8 mmrain
21/11/20245 mmrain
20/11/202417.6 mmrain

River flow that day: 117.998 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
11 counted spills · 23 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00885). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — OLD WOOLLEN MILL_CSO_BUCKFASTLEIGH — River Hub