Kilbury STW, Buckfastleigh

Spill evidence · Friends of the Dart

Kilbury STW, Buckfastleigh

Storm overflow at the works · SBB00179 · feeds BUCKFASTLEIGH STW
Wet weather

The discharge

Spill day
Thursday, 5 August 2021
Started
5 Aug 2021, 11:13
Ended
5 Aug 2021, 11:34
Duration
20 minutes 19 seconds
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/08/2021 (spill day)11.5 mmrain
04/08/20212.9 mmrain
03/08/20210.1 mmdry
02/08/20210 mmdry
01/08/20211.3 mmrain

River flow that day: 4.962 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Not Applicable
EA annual return (2021)
112 counted spills · 774 h total
Monitor uptime (2021)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00179). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Kilbury STW, Buckfastleigh — River Hub