Kilbury STW, Buckfastleigh

Spill evidence · Friends of the Dart

Kilbury STW, Buckfastleigh

Storm overflow at the works · SBB00179 · feeds BUCKFASTLEIGH STW
Dry spill

Evidence strength

Medium confidence
  • Dry on the EA 1-day window
  • Rain gauge close (≤5 km)
  • Monitor 100% operational that year
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Tuesday, 27 February 2024
Started
27 Feb 2024, 05:41
Ended
27 Feb 2024, 05:56
Duration
15 minutes
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/02/2024 (spill day)0.1 mmdry
26/02/20240 mmdry
25/02/202426.6 mmrain
24/02/20241.9 mmrain
23/02/20245.4 mmrain

River flow that day: 29.301 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Not Applicable
EA annual return (2024)
126 counted spills · 1233 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00179). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.
Spill evidence — Kilbury STW, Buckfastleigh — River Hub