KILBURY STW_SO_BUCKFASTLEIGH

Spill evidence · Friends of the Dart

KILBURY STW_SO_BUCKFASTLEIGH

Storm overflow at the works · SBB00179 · feeds BUCKFASTLEIGH STW
Dry spill

Evidence strength

Medium confidence
  • Dry on the EA 1-day window
  • Rain gauge close (≤5 km)
  • Monitor 100% operational that year
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Monday, 19 February 2024
Started
19 Feb 2024, 22:14
Ended
19 Feb 2024, 22:30
Duration
15 minutes 21 seconds
Receiving water
Dart
Parish
Buckfastleigh

Rainfall evidence

Daily rainfall at the matched gauge (Austins Bridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/02/2024 (spill day)0.1 mmdry
18/02/20240 mmdry
17/02/202434.4 mmrain
16/02/20242.3 mmrain
15/02/202417.3 mmrain

River flow that day: 30.094 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Steamer Quay, Dart Estuary
Shellfish water
Not Applicable
EA annual return (2024)
126 counted spills · 1233 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00179). Rainfall: EA Hydrology gauge fd8ea26c-8052-48c5-a1bb-bbd5ebbbb3d3_364176. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Hub.