Warfleet Creek pumping station, Dartmouth

SBB01316
Overflow on the network feeding Dartmouth STW · Pumping-station / emergency overflow
Designated bathing water · Warfleet Creek, Dart EstuaryShellfish water · Dart
Showing history for 2024 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
8 Jan, 16:00
Counted spills, 2024
7
8 discharge events
Hours spilled, 2024
51
Is the feed working?
Working
Last checked 16 min ago · we poll SWW hourly
48h agonow
46/48 hourly readings received
Dry spills, 2024
0
None in 2024 · 41 since 2020
How a dry spill is decided →
Spilled before its STW, 2024
8
8 in 2024 · 219 since 2020
What this means →
Why this one spills

This looks like a fault, not a storm.

This overflow has discharged in dry weather 41 times since 2020 — spills with no rainfall to excuse them. Its treatment works is not itself over capacity, so a catchment-wide explanation does not hold. Applied to this record, the two-stage lawfulness test is hard to pass: a recurring dry-weather discharge is not an exceptional circumstance, and where the remedy is routine maintenance the disproportionate-cost exception is hard to run.

How this verdict is reached →

The same works has emergency overflows too

All emergency overflows →

8 pumping-station emergency overflows feed Dartmouth STW works — raw-sewage relief outlets that should fire only when a pump fails. They are not in this page's feed; between them they have discharged about 2,903 recorded hours.

Warfleet No2 pumping station, Dartmouth2,514h totalworst year 2,514h
South Town, Dartmouth225h totalworst year 128h
Warfleet Creek pumping station, Dartmouth88h totalworst year 78h
Darthaven Marina pumping station, Kingswear54h totalworst year 28h
Dartmouth STW20h totalworst year 18h
Coles Court pumping station, Dartmouth1.4h totalworst year 1.4h
Nelson Road pumping station, Dartmouth0.63h totalworst year 0.45h
Mayors Avenue pumping station, Dartmouth0.28h totalworst year 0.20h

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 10/year)

Is anyone acting on this?

Flagged problems
Dry spilling41 dry spills since 2020Spills before its works219 times since 2020
Measures on record
  • Install and run event-duration monitoring
    Monitoringcomplete 2021
  • Reduction of spills to meet EnvAct_IMP drivers
    Improvementdue 2030
Verdict
Improvement under way

A physical improvement is committed against this overflow.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Warfleet Creek pumping station, Dartmouth's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

41 dry spills and 219 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2024: 7 spills · 8 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Spills by month, 2024

Dry Wet weather
2Jan
1Feb
Mar
1Apr
May
Jun
1Jul
Aug
Sep
Oct
3Nov