← All spills

FURZEGOOD SPS_PSCSOEO_MARLDON

SBB00481
Overflow on the network feeding COMPTON AND MARLDON STW · Pumping station overflow
Showing history for 2026 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
4 Jul, 20:37
Hours spilled, 2026
17
Is the feed working?
Working
Last checked 23 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2026
0
None in 2026 · 1 since 2020
How a dry spill is decided →
Spilled before its STW, 2026
11
11 in 2026 · 189 since 2020
What this means →
Why this one spills

The problem here is local, not the works.

This overflow spilled 189 times on days its own treatment works stayed shut — so the works still had capacity. That points upstream, to this branch of the network, rather than to a works too small for its catchment.

How this verdict is reached →

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems
Spills before its works189 times since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, FURZEGOOD SPS_PSCSOEO_MARLDON's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

1 dry spills and 189 pre-STW spills since 2020. Pick a year to see its events below.

Spills by month — 2026 to date

Dry Wet weather
5Jan
5Feb
Mar
Apr
May
Jun
1Jul