friendsofthedart.org ↗Log in
← All spills

Harbertonford STW

SBB00537
Overflow on the network feeding Harbertonford STW · Storm sewage overflow
Showing history for 2022 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
1 Jun, 12:39
Counted spills, 2022
0
0 discharge events
Hours spilled, 2022
0
Is the feed working?
Working
Last checked 8 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2022
0
None in 2022 · 78 since 2020
How a dry spill is decided →
Spilled before its STW, 2022
0
0 in 2022 · 0 since 2020
What this means →
Why this one spills

This looks like a fault, not a storm.

This overflow has discharged in dry weather 78 times since 2020 — spills with no rainfall to excuse them. Its treatment works is not itself over capacity, so a catchment-wide explanation does not hold. Applied to this record, the two-stage lawfulness test is hard to pass: a recurring dry-weather discharge is not an exceptional circumstance, and where the remedy is routine maintenance the disproportionate-cost exception is hard to run.

How this verdict is reached →

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems
High spill frequency574 discharge events since 2020Very long spills2,494 hours in the last full yearDry spilling78 dry spills since 2020
Measures on record
  • Install and run event-duration monitoring
    Monitoringcomplete 2021
  • Investigate the cause of the spills
    Investigationcomplete 2022
  • PR24 U_MON4 from U_INV2 investigation (U_MON4c)
    Monitoringdue 2026
  • MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
    Monitoringdue 2026
Verdict
Under investigation

An investigation or monitoring measure is active — a step towards a fix, not a fix in itself. It must lead to an improvement before anything changes.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Harbertonford STW's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

78 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2022: 0 spills · 0 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

No spills over 15 minutes in 2022

Nothing over 15 minutes was recorded at this overflow in 2022. Discharges shorter than 15 minutes are excluded everywhere on this site — a brief operational blip is not counted as a spill. How we know.