Ashprington STW

SBB00052
Overflow on the network feeding Ashprington STW · Storm overflow
Showing history for 2025 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
1 Mar, 03:47
Counted spills, 2025
0
0 discharge events
Hours spilled, 2025
0
Is the feed working?
Working
Last checked 2 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2025
0
None in 2025 · 2 since 2020
How a dry spill is decided →
Spilled before its STW, 2025
0
0 in 2025 · 0 since 2020
What this means →

Can its works cope?

Full capacity view →

This overflow drains to Ashprington STW, serving about 446 people on a 181 m³/day permit.

34%
of permitted flow
Within capacity

No capacity signal in the record.

On our estimate the works has spare capacity for about ~850 more people before it reaches its permitted flow.

The same works has emergency overflows too

All emergency overflows →

2 pumping-station emergency overflows feed Ashprington STW works — raw-sewage relief outlets that should fire only when a pump fails. They are not in this page's feed; between them they have discharged about 31 recorded hours.

Maltsters pumping station, Tuckenhay31h totalworst year 16h

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
181 m³/day (works DWF)
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems

Nothing flagged by the analysis.

Measures on record
  • Install and run event-duration monitoring
    Monitoringcomplete 2021
  • Investigate the cause of the spills
    Investigationcomplete 2022
Verdict
No problem flagged

The analysis flags no material problem here.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Ashprington STW's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

2 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2025: 0 spills · 0 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Dry spills, every year

2 dry spills since 2020 · showing up to 12

17 Jan, 17:47
25m
0.1
Not spilling
→
17 Jan, 15:08
23m
0.1
Not spilling
→

Spilled before its works

0 events since 2020 · started while Ashprington STW stayed shut

This overflow has never been recorded spilling ahead of its treatment works.

No spills over 15 minutes in 2025

Nothing over 15 minutes was recorded at this overflow in 2025. Discharges shorter than 15 minutes are excluded everywhere on this site — a brief operational blip is not counted as a spill. How we know.