← All spills

St Lukes Church, Buckfastleigh

SBB01145
Overflow on the network feeding Buckfastleigh STW · Combined sewer overflow
Showing history for 2026 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
29 Aug, 06:56
Hours spilled, 2026
0
Is the feed working?
Working
Last checked 1h ago · we poll SWW hourly
48h agonow
47/48 hourly readings received
Dry spills, 2026
0
None in 2026 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2026
0
0 in 2026 · 13 since 2020
What this means →
Why this one spills

The problem here is local, not the works.

This overflow spilled 13 times on days its own treatment works stayed shut — so the works still had capacity. That points upstream, to this branch of the network, rather than to a works too small for its catchment.

How this verdict is reached →

Can its works cope?

Full capacity view →

This overflow drains to Buckfastleigh STW, serving about 7,795 people.

of permitted flow
Not assessed

The works has headroom — spills here point upstream, to a blockage, failed pump or infiltration.

The same works has emergency overflows too

All emergency overflows →

4 pumping-station emergency overflows feed Buckfastleigh STW works — raw-sewage relief outlets that should fire only when a pump fails. They are not in this page's feed; between them they have discharged about 2,054 recorded hours.

Dart Bridge pumping station, Buckfastleigh1,140h totalworst year 920h
Blackrock pumping station, Buckfast913h totalworst year 375h
Dean Prior pumping station1.4h totalworst year 0.90h

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 10/year)

Is anyone acting on this?

Flagged problems
Spills before its works13 times since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, St Lukes Church, Buckfastleigh's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

0 dry spills and 13 pre-STW spills since 2020. Pick a year to see its events below.

Spills by month — 2026 to date

Dry Wet weather
1Jan

Every spill in 2026, most recent first

Each event checked against the nearest rain gauge and against the treatment works' own overflow. Open any row for its evidence dossier.

29 Jan, 21:34
28m
21.7 mm
Wet weather
Also spilling