MILL CREEK SPS_PSCSOEO_DITTISHAM

SBB00776
Overflow on the network feeding DITTISHAM MAIN_STW_DITTISHAM · Pumping station overflow
Showing history for 2025 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
30 Aug, 20:55
Hours spilled, 2025
16
Is the feed working?
Working
Last checked 12 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2025
0
None in 2025 · 10 since 2020
How a dry spill is decided →
Spilled before its STW, 2025
1
1 in 2025 · 42 since 2020
What this means →
Why this one spills

The problem here is local, not the works.

This overflow spilled 42 times on days its own treatment works stayed shut — so the works still had capacity. That points upstream, to this branch of the network, rather than to a works too small for its catchment.

How this verdict is reached →

Can its works cope?

Full capacity view →

This overflow drains to DITTISHAM MAIN_STW_DITTISHAM on a 66 m³/day permit.

of permitted flow
Not assessed

The works has headroom — spills here point upstream, to a blockage, failed pump or infiltration.

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
66 m³/day (works DWF)
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems
Dry spilling10 dry spills since 2020Spills before its works42 times since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, MILL CREEK SPS_PSCSOEO_DITTISHAM's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

10 dry spills and 42 pre-STW spills since 2020. Pick a year to see its events below.

Spills by month, 2025

Dry Wet weather
3Jan
Feb
Mar
Apr
May
2Jun
Jul
3Aug
1Sep
Oct
Nov
5Dec