HARBERTON STW_SSO_HARBERTON
The monitor is reporting and shows no discharge.
This looks like a fault, not a storm.
This overflow has discharged in dry weather 67 times since 2020 — spills with no rainfall to excuse them. Applied to this record, the two-stage lawfulness test is hard to pass: a recurring dry-weather discharge is not an exceptional circumstance, and where the remedy is routine maintenance the disproportionate-cost exception is hard to run.
How this verdict is reached →Can its works cope?
Full capacity view →This overflow drains to HARBERTON_STW_HARBERTON, serving about 1,357 people on a 150 m³/day permit.
The works itself needs investment or a lower permit.
Its permit
What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.
- Pass-forward flow
- 150 m³/day (works DWF)
- Spill frequency limit
- None set
- Monitoring tier
- Not published
- Assessment trigger
- Crossed — over 10 spills/year
Is anyone acting on this?
- Install and run event-duration monitoringMonitoringcomplete 2021
- Investigate the cause of the spillsInvestigationcomplete 2022
- PR24 U_MON4 from U_INV2 investigation (U_MON4c)Monitoringdue 2026
- MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)Monitoringdue 2026
An investigation or monitoring measure is active — a step towards a fix, not a fix in itself. It must lead to an improvement before anything changes.
What you can do about this one
Ask for the data
Under the Environmental Information Regulations, HARBERTON STW_SSO_HARBERTON's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.
Get it into the next programme
Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.
Put it in the drainage plan
South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.
The record since 2020
67 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.
Dry spills, every year
67 dry spills since 2020 · showing up to 12
Spilled before its works
0 events since 2020 · started while HARBERTON_STW_HARBERTON stayed shut
This overflow has never been recorded spilling ahead of its treatment works.
Spills by month, 2025
Dry Wet weatherEvery spill in 2025, most recent first
Each event checked against the nearest rain gauge and against the treatment works' own overflow. Open any row for its evidence dossier.
Showing the last 80 events of 121 in 2025.