← All spills

PRINCETOWN STW_SO_PRINCETOWN

SBB00985
Overflow on the network feeding PRINCETOWN STW · Storm overflow at the works
Showing history for 2026 · records go back to 2026
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
29 Aug, 11:07
Hours spilled, 2026
11
Is the feed working?
Working
Last checked 14 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2026
0
None in 2026 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2026
0
0 in 2026 · 0 since 2020
What this means →

Can its works cope?

Full capacity view →

This overflow drains to PRINCETOWN STW, serving about 1,443 people on a 1,023 m³/day permit.

20%
of permitted flow
Within capacity

The works has headroom — spills here point upstream, to a blockage, failed pump or infiltration.

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
1,023 m³/day (works DWF)
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 30/year)

Is anyone acting on this?

Flagged problems

Nothing flagged by the analysis.

Measures on record
  • Install and run event-duration monitoring
    Monitoringcomplete 2021
  • Install and run event-duration monitoring
    Monitoringcomplete 2024
  • Deliver a physical improvement
    Improvementcomplete 2024
  • Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
    Monitoringdue 2026
  • MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
    Monitoringdue 2026
Verdict
Under investigation

An investigation or monitoring measure is active — a step towards a fix, not a fix in itself. It must lead to an improvement before anything changes.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, PRINCETOWN STW_SO_PRINCETOWN's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

0 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Dry spills, every year

0 dry spills since 2020 · showing up to 12

No dry spills on record for this overflow since 2020.

Spilled before its works

0 events since 2020 · started while PRINCETOWN STW stayed shut

This overflow has never been recorded spilling ahead of its treatment works.

Spills by month — 2026 to date

Dry Wet weather
Jan
Feb
Mar
Apr
May
2Jun
Jul
3Aug

Every spill in 2026, most recent first

Each event checked against the nearest rain gauge and against the treatment works' own overflow. Open any row for its evidence dossier.

29 Aug, 09:55
1h 12m
28.8 mm
Wet weather
Also spilling
29 Aug, 05:10
52m
28.8 mm
Wet weather
Also spilling
27 Aug, 05:20
1h 12m
37.6 mm
Wet weather
Also spilling
8 Jun, 05:26
1h 3m
10.0 mm
Wet weather
Also spilling
6 Jun, 07:39
6h 19m
26.6 mm
Wet weather
Also spilling